4-20Ma Interface; Connecting The Instrument To A Controller From Dräger; Installing Software Dongles - Dräger PointGard 2000 Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 68
|
en
Mounting and installation
WARNING
Risk of electric shock
Exceeding extra low voltage (ELV) can cause electric shocks.
ELV limit for AC ≤ 50 V
ELV limit for DC ≤ 120 V
► If ELV exceeds the limits, connect pin 2 (PE) of the power
supply connector to protective earth.
Wiring table relay connection
With factory default settings and during normal operation, the
relays are energized. This provides "failsafe" operation.
Relay connector
The relay labels (NO, COM, NC) represent the default state
(normally energized) of all relays while the instrument is
powered.
Pin
Mark
Relay
1
NC
A1
A1
2
COM
A1
3
NO
A1
4
NC
A2
A2
5
COM
A2
6
NO
A2
7
NC
FLT
Fault
8
COM
Fault
9
NO
Fault
Connecting the 9-pin connector
1. Route the relay wires through the corresponding cable
gland.
2. Insert the relay wires in the provided 9-pin connector.
a. Connect the wires for A1 (pre-alarm), A2 (main alarm),
and FLT (fault relay) to the terminals.
b. Check the correct connection with the wiring table and
the marks on the circuit board.
c. Secure the cable cores by tightening a cable tie
around them.
3. Plug the 9-pin connector into the socket and tighten
screws with correct torque (4.4 ... 5.3 Lbs. In. / 0.5 ... 0.6
Nm).
4. Close the instrument.

4.5.3 4-20mA Interface

The 4-20mA interface allows transmitting the measured
values to a control unit. Only an operation as current source is
possible.
3-pin connector
A 3-pin connector is provided for the connection of the 4-20
mA interface wiring.
12
Normally Closed
Common
Normally Open
Normally Closed
Common
Normally Open
Normally Closed
Common
Normally Open
Wiring table 4-20 mA interface connection
Pin
Mark
1
P
2
PE
3
M
Connecting the 3-pin connector
1. Route the 4-20mA interface wires through the
corresponding cable gland.
2. Remove the bridge between pin 1 and 3 of the 3-pin
connector.
3. Insert the wires in the provided 3-pin connector
a. Check the correct connection with the wiring table and
the marks on the circuit board.
4. Secure the cable cores by tightening a cable tie around
them.
5. Plug connector into the socket and tighten screws with
correct torque (1.9 ... 2.2 Lbs. In. / 0.22 ... 0.25 Nm).
6. Close the instrument.
NOTICE
Unless special measures are taken (e. g. capacitive earthing),
the shield must only be connected at one end.
NOTICE
If the 4-20 mA interface is no longer used, reinstall the bridge
between pin 1 and 3 of the 3-pin connector.
4.6
Connecting the instrument to a
controller from Dräger
Please refer to the Instructions for Use which was included
with the Dräger controller.
4.7

Installing software dongles

PointGard 2100 EC-specific:
1. Open the instrument.
2. Insert the dongle with the Dräger logo facing upwards in
the slot of the PCB unit on the back of the cover.
3. Close the instrument.
Instructions for use
1
2
3
Function
4 to 20 mA signal +
Shield
4 to 20 mA signal -
|
Dräger PointGard 2000 Series

Publicité

Table des Matières
loading

Table des Matières