Installa On Guide - Gallagher MB1800i Notice D'installation

Masquer les pouces Voir aussi pour MB1800i:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
Gallagher 3E4345 MB1800i MB2800i Energizer User Manual
INSTALLATION GUIDE
Step 1. Install the Energizer
Energizer must be installed under cover, where it
is protected from the environment. For further
installa on op ons refer to Mul Power Op ons
below.
Mount the energizer on a wall and out of reach of
children. Install where there is no risk of the energizer
incurring fi re or mechanical damage and if possible
away from heavy electrical equipment eg. pumps or other items
that may cause electrical interference.
a)
Using the template on the back page, drill 2 x 4mm
(5/32") holes (A & B).
b)
Fix the screws provided into the wall leaving the head
of the screw about 3mm (1/8") out from the wall.
c)
Place the energizer over and slide down onto the
moun ng screws.
d)
Remove orange terminal cover to expose Fence, Earth
and Reference Earth terminals.
Mul Power Op ons
Mains
Powered
Battery
Powered
a
b
Solar/ Battery
Powered
9

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mb2800i

Table des Matières