Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
Gallagher 3E4348 MB1000 Energizer User Manual
INSTALLATION GUIDE
Step 1. Install the Energizer
Important: Energizer must be installed under cover,
where it is protected from the environment. For
further installa on op ons refer to Mul Power
Op ons below.
Energizer must be installed under cover, where it is
protected from the environment.
Mount the energizer on a wall and out of reach
of children. Install where there is no risk of the
energizer incurring fi re or mechanical damage and if possible
away from heavy electrical equipment eg. pumps or other
items that may cause electrical interference.
a)
Using the template on the back page, drill 2 x 4mm
(5/32") holes (A & B).
b)
Fix the screws provided into the wall leaving the head of
the screw about 3mm (1/8") out from the wall.
c)
Place the energizer over and slide down onto the
moun ng screws.
d)
Remove orange terminal cover to expose Fence and
Earth terminals.
Mul Power Op ons
Mains
Powered
Solar/ Battery
Powered
a
b
7

Publicité

Table des Matières
loading

Table des Matières