Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECT DUCTWORK

Ducted Configuration
1. Use (2) screws (4.8x38mm) and wall
anchors to secure upper bracket to the
ceiling or wall as shown.
2. Use 6" round metal duct to connect the duct
collar on the hood to the ductwork above.
3. Use duct tape to make all joints secure and
air tight.
4. Remove the 2 screws securing the flues.
5. Connect the upper section of decorative flue
to the bracket with screws provided
(3.2x13mm).
6. Slide the lower section of decorative flue
downward, until it fits properly around hood.
7. Secure decorative flue to hood with screws
provided (3.2x13mm).
FASTEN
FLUE TO
HOOD & UPPER
BRACKET WITH
SCREWS
(3.2x13mm)
FIXING TO THE WALL
MOUNTING
SCREWS
(4,8x38mm)
FIXING TO THE CEILING
MOUNTING
SCREWS
(4,8x38mm)
- 7 -
FLUE MOUNTING
BRACKET
FLUE MOUNTING
BRACKET
DECORATIVE
FLUE
DUCT TAPE
AIR VENT
POSITION FOR
DUCTED
CONFIGURATION
6" ROUND
METAL DUCT

Publicité

Table des Matières
loading

Table des Matières