Bind the assembly
with the roll of plastic
film, using a tightening
force to keep it in firmly
place.
Block up
the hole
in the wall
with the
mastic.
Screw and tighten the connections on the external
unit.
112500-504-D
© FAR GROUP EUROPE 2004
52
Fix the collars to the wall in order to
hold the pipes.
Let 20 to 30 cm of the
evacuation pipe for con-
densates stick out, so as
to be able to connect it
later to a pipeline.
et the two half-shells
in place, then finish the
interior blocking with the
rest of the mastic.
17/05/04, 17:03
GB
Tighten the collars.