Wieland SA-IN-S-K Série Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
Installation
Place device on mounting rail.
Attention
Ensure that grounding spring is in the correct
position. The grounding spring on the module
must make a secure and electrically conductive
connection with the mounting rail.
Dismantling
Remove the plug-in terminals, wiring and end
clamps.
Cover - Dismantling
Subject to changes
Headquarter:
Wieland Electric GmbH
Brennerstraße 10 - 14
D-96052 Bamberg
12
Snap the module onto the mounting rail by pres-
sing gently in the direction of the arrow.
Attention
Push the modules apart one at a time in the
direction of the arrow until the connectors at the
sides disengage.
Sales and Marketing Center:
Wieland Electric GmbH
Benzstraße 9
D-96052 Bamberg
Push the modules together one at a time in the
direction of the arrow until the connectors at the
sides engage and then install the end clamps at
the left and right ends.
Push down at the back.
While pressing down, remove the module from
the mounting rail in the direction of the arrow.
Phone +49 (0) 9 51/93 24-0
Fax +49 (0) 9 51/93 24-198
Technical Hotline +49 (0) 9 51/93 24-995
www.wieland-electric.com
info@wieland-electric.com

Publicité

Table des Matières
loading

Table des Matières