Make Lifting Units Operational - Blitz HydroLift S3 2–6.2-DC Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 148

9.1 Make lifting units operational

1. Turn off all lifting units and the main switch.
2. Open the cover.
3. Top up oil. (→ 11.5)
4. Insert and connect batteries. (→ 11.9)
5. Bleed the lifting unit. (→ 11.4)
6. Check oil level. (refill if necessary) (→ 11.3)
7. Remove transport lock [6].
8. Adjust the ground clearance of the chassis
with screw [7].
9. Close cover and screw down.
10. Charge the batteries. (→ 10.9)
Steps 1 to 10 must be repeated for all lifting units.
Steps 3, 4, 5 and 6 are only necessary if the lifting
units have been delivered without oil and batteries.
126746
Installation and initial commissioning
[2]
[3]
[4]
[6]
[7]
HydroLift
10mm
93

Publicité

Table des Matières
loading

Table des Matières