Initial Commissioning; Operation; Control Elements - Blitz HydroLift S3 2–6.2-DC Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 148
HydroLift

Operation

9.2 Initial commissioning

Before initial commissioning, a "safety check" must be carried out by a qualified person. He
has to confirm the proper installation and the correct functioning of the lifting system. The
result of the test is to be documented in the form initial commissioning in the annex. (→
Annex Inspection log book)
10 Operation

10.1 Control elements

1. Display with control buttons
2. Battery level indicator
3. Group / resolve lifting units
4. Change grouping
5. Lifting
6. Emergency stop
7. Lower
8. Lower slowly
9. Set down on notch
10. Assign a position to the lifting unit on the
vehicle
11. LED display
12. Lighting
13. Set height limit
14. Clear fault codes
94
DANGER
Risk of death and injury
Read and adhere to the operating instructions.
The lifting unit may only be operated by properly trained workshop
personnel.
Use the lifting unit only in a technically sound condition.
Always keep the movement range of the load and the load-carrying
equipment unobstructed.
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[14]
[13]
[12]
[11]
[10]
[9]
[8]
126746

Publicité

Table des Matières
loading

Table des Matières