Softener Operation - Atag Descale Notice D'installation

Masquer les pouces Voir aussi pour Descale:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TOTAL CUBIC METERS
50,0
ERROR LOG
403

6. Softener operation

Meter Regeneration
In normal use, the LCD display alternates between time of day, remaining capacity (m3),
flow rate, number of days until next regeneration and the installer or softener name.
At the time of regeneration, controller compares remaining capacity with reserve and
decides wether to start or not start a regeneration. Softener can have as an option of a
blending device to insure a residual hardness in softened water.
Controller during regeneration
During regeneration, the LCD display shows the cycle number, its name and the
remaining time for this cycle. When all the cycles are done, the valve comes back in to
service position. The controller can handle co-current regeneration (brining in the same
way as flow), counter current (upflow brining), with wet (fill after rinse) or dry brine tank
(prefill) and normal or proportional brining.
Valve operation during programming
To enter program mode the valve has to be in service. While in the program mode, the
valve will continue to operate normally monitoring all information. The programming is
stored in permanent memory.
Valve operation during a power failure
During a power failure all control displays and programming will be stored for use when
power is resumed. The control will retain these values for years, if necessary without loss.
The control will be inoperative and any calls for regeneration will be delayed. The control
will, upon power resumption operate normally from the point where it was interrupted.
Number of used M
3
Push on
to go to the next parameter
Records of last 10 potential errors generated by the
controller.
Push on
to go to the normal mode
since start up
19

Publicité

Table des Matières
loading

Table des Matières