Zephyr Breeze I Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Remove filters
3. If using a cable lock, pry open the
desired electrical knockout either on
top or back of hood. Feed the wires
through the cable lock. Some local
codes require the use of a cable lock,
check your local codes.
5. Secure 3-1/4" x 10" starting collar
with damper to the duct opening using
(10) M4x8 screws.
2. Remove cover from junction box to
gain access to electrical wiring.
4. If using hood in air recirculating
mode skip steps 4 and 5.
Pry open desired 3-1/4" x 10" ducting
knock-out either on top or back of
hood.
10
www.zephyronline.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Breeze ii

Table des Matières