Transport And Handling; Storage; Installation; Installation Conditions - FPZ SCL R20-MD MOR IE2 Instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46

11.3 TRANSPORT AND HANDLING

Manual handling and transport are permitted only in accordance with the current applicable
regulations.

11.4 STORAGE

Store the machine in a dry place, if possible keeping it in its packaging.
Do not remove the protection from the openings.

12 INSTALLATION

12.1 INSTALLATION CONDITIONS

Make sure the conditions of use as described in section 3 are complied with, then proceed with installation of the machine as specified
below.
The unit's support surface must be flat, sturdy, stable and as level as possible.
The unit must be installed on a structure that does not transmit vibrations. Do not install the unit on structures that can
transmit or amplify the noise.
FPZ-MI-R-MD-MOR-GOR-IE2-15-R03
===
m < 25 kg
36 / 119
m > 25 kg
m > 25 kg

Publicité

Table des Matières
loading

Table des Matières