IMER MOVER 190D Manuel D'utilisation Et D'entretien page 20

Pompe pour chapes
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Bear in mind that the weight is exerted almost entirely on the hook
on the compressor, and the other hooking points are mainly for
stabilisation.
Position the screed pump in a place where it is possible to have a
completely free area of at least 1 metre around the machine and a
When using the loading bucket and scraper, the machine operator
must constantly visually ensure there is no one else near the work
area, and therefore machine positioning should easily allow the
meeting of that requirement.
The machine must also be placed in such a way as to use the
least possible piping, without any obstacles during use and
cleaning.
Place the machine, correctly positioning the support feet and the
jockey wheel. The ground on which the machine stands must be
jockey wheel (ref.3).
surface, so as not to jeopardise the stability of the screed
pump during use.
Remove the safety pin from the bucket (ref.2).
Remove the lights bar before lowering the bucket (ref.4)
FIG.4
Extend the machine pipes to where the product is to be taken,
avoiding tight bends or constrictions.
When running the pipes upwards, secure them to the scaffolding
or other support points using the cloth pipe holder (vertical ancho-
supplied.
FIG.5
IMER INTERNATIONAL S.p.A.
safety split pins and if the jet breaker stand is not connected.
can compromise correct machine operation as well as the
safety of operators.
gs and gaskets are in perfect condition
If present, connect the scraping shovel to the winch and cable
winder.
22
FIG.6a
FIG.6b
FIG.7
-The machine cannot be used if the connections lack
FIG.8
-

Publicité

Table des Matières
loading

Table des Matières