Broan ALLURE QS2 Série Mode D'emploi page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARE THE HOOD
4
Remove either top or back wiring knockout and install ap-
proved Electrical Cable Clamp.
Ducted Installation - Skip to Step 11.
The following Steps (5 thru 10) are for
NON-DUCTED INSTALLATION ONLY.
(3) #8 SCREWS
(2) #8 SCREWS
Remove Light Panel - held in place with (3) #8 screws
5
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
ELECTRICAL
CABLE CLAMP
LIGHT
PANEL
PREPARE THE HOOD
6
Remove Air
Chute - held in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
7
Remove Baffle
from air chute.
Tabs will disen-
gage
from Slots.
8
Rotate baffle. Reinsert
baffle into air chute (as
shown) so that baffle fits
all the way into
into air chute. An audible
"click" will
be heard when
fully installed.
This will direct
air flow through
the non-ducted
slots on top
of hood.
9
Re-install air chute and screw,
re-connect wire harness, and replace light panel.
NOTE: Be careful not to trap wires between Support Fin
and light panel.
ALLURE
QS2 SERIES
®
RANGE HOOD
AIR CHUTE
BAFFLE
TABS
SLOTS
SUPPORT FIN
Page 3

Publicité

Table des Matières
loading

Table des Matières