LF Master Forge BG1795BAL Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
4. Place the warming rack (B) as shown.
5.Open the cabinet door of the main
body (A) and place the drip tray (D) in
position as shown.
6.Unscrew the igniter push button cap
and feed the "AA" battery (AA) into the
igniter module with the positive (+) end
facing out. Screw the cap into place on
the igniter module.
Hardware Used
AA Battery
x1
9

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

083996641915005

Table des Matières