.
Connecting the sensor or sensors to the measuring instru-
ment and starting up
Using a connection cable, the individual sensor or sensor bus system
should be connected to one of the CAN ports on the Parker Service Mas-
ter Plus measuring instrument.
After the measuring instrument is turned on, the sensor is automatical-
ly detected and initialized. The start screen appears on the display after
this process has ended. The LED signals on the CAN sensors are used
for identification and status display.
►
Additional information about the LED signals can be found in the
"LED signals on the sensor" table.
After the boot-up process, you can make further setting changes on the
Parker Service Master Plus measuring instrument or you can begin mea-
suring.
►
Additional information about operating the Parker Service Master
Plus measuring instrument can be found in the instrument's operat-
ing instructions.