1.
Introduction
The TERXON L operating panels are defined for the TERXON L intruder
alarm system. The operating panel has an integrated chip-key reader.
The 2-line LCD display of the operating panel shows the functions, the
system state and the alarm messages.
2.
Installation
1. Make sure that the power supply (mains and battery) are both
disconnected from the system.
2. Open the casing by unscrewing the base.
3. Use the base as a drilling template and then thread the cables
through.
4. Fix the base to the intended location using appropriate screws.
5. Connect all cables and set the jumpers and switches as described
on the next page.
6. Clamp the base to the operating panel and screw it tight.
HINWEIS:
The TERXON-L operating panel has a coil that enables it to be
activated/deactivated with a proximity chip-key. The coil works with a low radio
frequency and has a circular detection area of about 120mm around the operating
panel. Proximity chip-keys can be detected by wood, stone, plaster, glass and
plastic.
7