Tools Needed; Materials Needed - Bosch SHI Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TOOLS NEEDED

Hammer
Tape Measure
Wire Cutter

MATERIALS NEEDED

(Additional materials may be required to comply with local codes.)
Electrical Supply Cable - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper
conductors.
Hot Water Supply Line - Minimum 3/8" O.D. copper tubing or metal braided dish-
washer supply line.
Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compres-
sion fitting, or braided hose).
90° elbow with 3/8" N.P.T. male threads on one leg, and sized to fit your water supply
line (copper tubing/compression fitting, or braided hose) on the other leg.
Teflon tape or other pipe thread compound to seal plumbing connections.
UL listed conduit connector or strain relief.
2
Tools and Materials Needed
Hole Saw
Slot Screwdriver
Wire Stripper
Pipe Wrench
Phillips Screwdriver
Drill
Adjustable Wrench
Torx Screwdriver
Level

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

ShvShy66Shx99a

Table des Matières