Daikin UATYQ250MCY17 Manuel D'installation page 38

Conditionneurs d'air en toiture
Table des Matières

Publicité

(ii)
Down return (vertical) application
STEP 1
-
Disconnect power supply to the unit and install a safety lockout tag before installation, commisioning or service
of the economizer unit. Prepare all the tools required as mentioned above.
STEP 2
-
Unpack the wooden crate of economizer kit by using crowbar and hammer. Then, remove the polybags containing
loose parts and fasteners by using cutter. Perform preinstallation checking as mentioned above.
STEP 3
-
Attach support bracket, down throw (item 12) to return air damper (item 11) by using screw M5x16 (item 13)
provided in the kit.
Support bracket, down throw (item 12) is not available in ECONO 700 & 900. To install economizer kit for this
model, ignore step 3 and jump to step 4.
STEP 4
-
Mount 1pc Belimo actuator, LF24-SR (item 1) to return air damper (item 11). Align and insert the hole of actuator
to the shaft of the damper.
The default setting for return air damper (item 11) shall be fully opened. Ensure this damper is in 'fully opened' position
before mount the actuator. Fail to do so will cause errors during the unit normal operation.
36
Screw item 12
to item 11.
Item 11
Item 12
CAUTION 1

Publicité

Table des Matières
loading

Table des Matières