EdilKamin CHERIE Mode D'emploi page 43

Masquer les pouces Voir aussi pour CHERIE:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 64
COVERING INSTALLATION MOON/SPACE
Phase A
Phase C
ASE 3
142
D
A
151
140
47
141
D
151
A
140
151
B
47
B
151
C
42
C
Phase D
Phase E/F
Phase G
74
74
78
79
Phase A
Phase B
This phase presents the stove after being unpacked and
positioned in the room
Phase B
Remove the front panel (69) to remove the two screws
69
holding the upper right (51) and left (49) cast iron front
panels
Phase C/D
Assemble the plates (140) to the stone sides "A-B" (47)
with TE M 6x12 screws supplied and point in the 4.2 x
9.5 self-tapping screws without tightening them to the
153
142
152
D
141
two front and rear locking brackets (141-142-152-153)
D
A
to the structure.
A
Now insert the stone side (47), first inserting it in the
140
47
rear part "C" and then turning it and resting it on the
47
upper part, fitting it in the front bracket "D" (141-152).
140
Now tighten screws, which were previously pointed in,
151
B
C
on the front and rear locking brackets (141-142-152-
C
153).
43
Note:
During the assembly phase of the stone series, check that
the stones are aligned with the cast iron top. If they are
not, or rather they are within a few mm, a flat washer
must be placed between the side stone and the centring
bracket (151) to compensate for the indentation of the
coating.
Phase E
Assemble the cast iron front panel (53) and bracket
(151) to the upper front panel (69) with screws (71) pro-
vided, then reposition "G". Unscrew the two screws
(58) and remove the lower profile "H" (52). Assemble
F
the cast iron front panel (53) and bracket (151) to the
71
lower front panel (52) with screws (71) provided and
69
then place it in its housing and screw "I".
E
53
Phase F
G
Replace the two upper right (51) and left (49) front
53
panels and screw the front with the previously removed
52
58
H
screws.
58
Position the front grille (69) by pressing
L
71
L
I
Phase H
Phase G
Position the cast iron top (78), the three pads (74) in
their housing, then place the stone top (79) over.
Phase H
The stove is now ready to be positioned.
43

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

FunnyMoon spaceVintage

Table des Matières