EdilKamin CHERIE Mode D'emploi page 42

Masquer les pouces Voir aussi pour CHERIE:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 64
COVERING INSTALLATION FUNNY
Phase A
Phase B
D
47
G
52
58
F
I
Phase C
79
74
74
78
Phase D
71
69
53
E
53
58
F
I
H
71
42
Phase A
This phase presents the stove after being unpacked and
positioned in the room
Phase B
Remove the upper front panel "D" (69) which is fitted
into place, then assemble the ceramic front panel "E"
(53) to the upper front panel (69) with screws (71) sup-
plied, then reposition.
Unscrew the two screws (58) and remove the lower pro-
file "F" (52).
Assemble the ceramic front panel (53) to the lower front
panel "H" (52) with screws (71) provided, then reposi-
tion in housing and screw in.
Phase C
Position the cast iron top (78), the three pads (74) in
their housing, then place the ceramic top (79) over.
Phase D
The stove is now ready to be positioned.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

FunnyMoon spaceVintage

Table des Matières