LG PACP5A000 Manuel D'installation page 13

Hvac controleur (acp 5)
Masquer les pouces Voir aussi pour PACP5A000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing ACP 5 and
connecting cables
After setting PI485, the ACP 5 shall be
installed in an adequate place, and RS-485
cable shall be connected for the
communication with PI485.
And, Ethernet cable (LAN cable) shall be
connected for the connection with internet or
AC Manager 5.
To fix the ACP 5, the following 2 methods
may be used.
Install in DIN RAIL or fix to the wall
considering the environment of the site.
Power
LAN cable
CAUTION
!
Use the designated parts
when connected to a power
source.
• Connector manufacturers:
PHOENIX CONTACT
• PartNo: MVSTBR 2.5 /
2-ST-5.08 2P 5.00 mm(3/16")
PACP5A000
RS-485 cable
INSTALLING ACP 5
Installing the ACP 5 in DIN RAIL
ACP 5 can be installed in DIN RAIL with width
35 mm(1 -3/8") and height 7.5 mm(19/64").
Proceed as the follows to install the ACP 5 in
an adequate place.
The installation method of the ACP 5 is
explained here with the example of installing
the ACP 5 in DIN RAIL.
• Decide the space to install the ACP 5.
• Before installing the ACP 5, check if it is the
adequate place to connect the ACP 5 with
the power, RS-485, and LAN cable.
• Install DIN RAIL.
• Hook the top part of the ACP 5 on DIN RAIL.
• Push the main body of the ACP 5 until you
hear the sound of installation.
• Pull the ACP 5 to check if it is fixed.
CAUTION
!
• After installing to DIN RAIL, do not fix to
the wall using screws.
• ACP 5 may be damaged.
• DIN Rail fixing Screw Spec: M3, screw
head height 1.75 mm(1/16") ~ 2.0
mm(3/32"), screw head diameter 5.5
mm(7/32") ~ 7.0 mm(9/32").
13
Hooking on
DIN RAIL
Fixing to DIN RAIL

Publicité

Table des Matières
loading

Table des Matières