Mitsubishi Electric Mr. SLIM PEAD-A24AA4 Manuel D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8
[Fig. 8-5]
2
3 4
1
TEMP.
F
MENU
ON/OFF
E
BACK
MONITOR/SET
DAY
PAR-21MAA
CLOCK
OPERATION
G
C
D
[Fig.8-6]
CHECK
ON/OFF
E
MODE
CHECK
LOUVER
F
TEST RUN
SET
RESET
11
[Fig. 11-1]
4
ON/OFF
A
FILTER
CHECK
TEST
B
CLEAR
1
1
CHECK
D
TEMP
3
C
CHECK
FAN
AUTO STOP
VANE
AUTO START
h
A
min
B
CLOCK
G
A Indoor unit
B Union
C Liquid pipe
D Gas pipe
E Stop valve
F Outdoor unit
G Refrigerant gas cylinder operating valve
8.4
1
2
2
CHECK
4
CHECK
11.1
B
E
A
C
D
M
L
K
H
I
J
H Refrigerant gas cylinder for R410A with
siphon
I Refrigerant (liquid)
J Electronic scale for refrigerant charging
K Charge hose (for R410A)
L Gauge manifold valve (for R410A)
M Service port
⁄ Mode number
1
⁄ Setting number
2
⁄ Refrigerant address
3
⁄ Unit number
4
A Filter
button (<Enter> button)
B TEST button
C Set Time button
D Timer On/Off button (Set Day button)
E Mode selection button
F Set temperature button
G Timer Menu button (Monitor/Set button)
A Hour button
B Minute button
C TEMP button
D TEMP button
E ON/OFF button
F CHECK button
F
7

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Mr. slim pead-30aa4Mr. slim pead-36aa4Mr. slim pead-42aa4

Table des Matières