Perry Electric 1GA 47917MET/P Instructions Pour L'installation Et Mode D'emploi page 22

Detecteurs de gaz naturel ou de butane/propane
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.i - RECORDING THE DATE OF REPLACEMENT
Note: in accordance with the reference standard,
years from installation
(see chap. 5.u) and the replacement date indicated in the space
provided on the front of the box, as shown below (fig. 20).
!
Select the adhesive label corresponding to the month of installation (replacement) (e.g.
January = 01, October = 10), remove from the backing sheet and fix it to the appliance.
!
Select the label corresponding to the year of replacement (e.g.: Year of installation 2007 + 5
years: fix the label 2012), remove from the backing sheet and fix.
G
!
Record the date of installation, manufacture, replacement, installation area, contractor stamp
B
and signature in the spaces provided alongside.
Months labels
replacement
01
07
02
08
03
09
04
10
05
11
06
12
E.g.: with July 2007 as installation date, attach the labels:
07
07
2012
22
the appliance must be replaced after 5
Years labels
replacement
Year of
Replacement
installation
Years
2007
2012
2018
2008
2013
2019
2009
2014
2020
2010
2015
- - - -
2011
2016
- - - -
2012
2017
- - - -
2012
ON
TEST
RESET
Installation date
Manufacture date
*Replacement date
*after 5 years from date of installation
Year of
installation
Installation area
2013
*dopo 5 anni dalla data di installazione
2014
2015
- - - -
- - - -
- - - -
Contractor stamp and signature
Fig. 20
ENTER THE INDICATED DATA

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1ga 47917gpl/p

Table des Matières