Commissioning / Operation - Stahl 7571/11 Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8

Commissioning / operation

The surface of the plug pins must not be damaged!
Before commissioning, ensure that:
• the devices have been installed in accordance with the standards
• the equipment is not damaged
• no extraneous particles are present in the devices
• the terminal chamber is clean
• the connections have been correctly made
• the cables are inserted properly
• all bolts and nuts are tightened firmly
• the cable entries and stopping plugs are connected firmly
• unused wire lead-ins are sealed with stoppers certified as compliant with Directive
94/9/EC and unused drilled holes are sealed with stoppers certified as compliant
with Directive 94/9/EC
Type 7571/11
Wall-mounting socket Type 7571/11 is only supplied with power when a plug is inserted.
It should only be used in conjunction with Type 7571/12, 8571/12, 7578/12 or 8578/12
plugs from
bayonet ring when the plug is pulled out.
Type 7571/12
The plug may only be placed in operation when it is completely and appropriately installed!
After a short circuit, thoroughly check the functionality of the plug.
Plug Type 7571/12 can be used in conjunction with the following products from
R. STAHL Schaltgeräte GmbH:
• Wall-mounting socket Type 7571/11 and 7578/11
• Flanged socket Type 7571/15 and 7578/15
• Coupler socket Type 7578/16
Plug Type 7571/12 also fits in industrial sockets (as per CEE standard)
R.STAHL. Make sure that the socket's hinged cover is closed with the
Wall-mounting socket Type 7571/11 and plug Type 7571/12
Commissioning / operation
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7571/12

Table des Matières