Télécharger Imprimer la page

FS S1900-8T Guide De Démarrage Rapide page 4

Swtch ethernet non géré

Publicité

Les langues disponibles

Les langues disponibles

Back Panel
Installation Requirements
Before you begin the installation, make sure that you
have the following:
Desktop mounting: ESD bracelet (or ESD gloves)
Wall mounting: ESD bracelet (or ESD gloves), ladder, marker,
hammer drill, rubber hammer, screwdriver
Site Environment:
Do not operate it in an area that exceeds an ambient
temperature of 45°C.
The installation site must be well ventilated. Ensure that there is
adequate air ow around the switch.
Be sure that the switch is level and stable to avoid any
hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping
water, heavy dew, and humidity.
Ensure wall and working platforms are well earthed.
8
7
6
5
4
3
2
1
Power Supply
EN
3

Publicité

loading