DECLARATION OF CONFORMITY OF THE MANUFACTURER
Object: Absence of asbestos and cadmium
We declare that the materials used for the assembly of all our appliances are without asbestos parts or asbestos derivates and that
in the material used for welding, cadmium is not present, as prescribed in relevant norm.
Object: CE n. 1935/2004 regulation.
We declare that in all products we produce, the materials which will get in touch with food are suitable for alimentary use, according
to the a.m. CE regulation.
INSTALLATION REGULATIONS
Installation of the product and auxiliary equipment in relation to the heating system must comply with all current Standards and
Regulations and to those envisioned by the law.
The installation and the relating to the connections of the system, the commissioning and the check of the correct functioning must
be carried out in compliance with the regulations in force by authorised professional personnel with the requisites required by the
law, being national, regional, provincial or town council present in the country within which the appliance is installed, besides these
present instructions.
Installation must be carried out by authorised personnel who must provide the buyer with a system declaration of conformity and will
assume full responsibility for final installation and as a consequence the correct functioning of the installed product.
Before installing the appliance, carry out the following checks:
• Make sure that the floor can support the weight of the appliance, and if it is made of flammable material, provide suitable
insulation (DIMENSIONS ACCORDING TO REGIONAL REGULATIONS).
• Make sure that there is adequate ventilation in the room where the appliance is to be installed, with particular attention to
windows and doors with tight closing (seal ropes).
• Do not install the appliance in rooms containing collective ventilation ducts, hoods with or without extractor, type B gas appliances,
heat pumps, or other appliances that, operating at the same time, can put the room in depression (ref. UNI 10683 standard)
• Make sure that the flue and the pipes to which the appliance will be connected are suitable for its operation. It is not allowed the
connection of various appliances to the same chimney.
• The diameter of the opening for connection to the chimney must at least correspond to the diameter of the flue gas pipe. The
opening must be equipped with a wall connection for the insertion of the exhaust pipe and a rosette.
• The installation must be appropriate and has to allow the cleaning and maintenance of the product and the flue.
Before installation, accurately wash the pipes of the system in order to remove any residuals that could compromise the correct
functioning of the appliance.
IMPORTANT:
a)
It would be appropriate to install an automatic or manual air valve to allow the air outlet from the plumbing system;
b)
In case of water leaking, close the water supply and promptly warn the after sales technical service;
c)
The system working pressure must periodically be checked.
d)
If not using the boiler for a long period of time, it is recommended that the after sales technical service is contacted to carry
out at least the following operations:
• close the water taps of both the thermal system and the domestic hot water system;
• empty the thermal system and the domestic hot water system if there is risk of freezing.
The DSA thermo appliances, can be installed in both an OPEN expansion Tank system and a CLOSED expansion Tank system .
La NORDICA S.p.A. declines all responsibility for damage to things and/or persons caused by the system. In
addition, it is not responsible for any product modified without authorisation and even less for the use of non
original spare parts. Your regular local chimney sweep must be informed about the installation of the appliance so that he
can check the correct connection to the chimney.
OPEN expansion Tank system
It is COMPULSORY that the OPEN expansion Tank system is provided with:
1. OPEN EXPANSION Tank: which has a capacity of 10% of total water content of thermo-product and of the installation. This is
installed at the highest point of the system, at least 2 m over the radiator that is at the highest level.
2. SAFETY PIPE : that connects through the shortest way, without descending or siphoning parts, the delivery of thermo-product to
the upper side of open expansion tank. ATTENTION: The inside diameter of the supply pipe which connects the thermoproduct with
the open expansion vessel must be equal to the internal diameter of the supply junction present in the thermoproduct. The above
mentioned connection pipe must be without siphoning parts.
3. LOAD PIPE : which connects the bottom of open expansion tank with the return pipe of installation. The minimum diameter must
be ¾" gas. All those parts must no have for any reason meditate intercept bodies that could accidentally exclude them and must be
placed in rooms which are protected from frost. On the contrary, if they freeze, the boiler body could break or even explode. In case
of frost placing it will be right to add a proper percentage of antifreeze liquid to the water of installation in order to delete the whole
problem. In no way there must be water circulation in the open expansion tank between the safety and loading pipe. This would
cause the water oxygenation and the consequent corrosion of thermo-product and installation in a very short time.
4. AUTOMATIC THERMAL DISCHARGE VALVE DSA which is a further positive safety that prevents the boiling even when electric
energy is missing. It is made by a valve cover like a pressure safety valve which differs from it as it opens by reaching a pre-
calibrated temperature (normally at 94 – 95°C) and unload hot water from the installation delivery. This will be replaced with as
much cold water coming from the open expansion tank loading pipe of open tank by draining away the excessive heat.
5. SAFETY VALVE FROM 1,5 bar: maximum operation pressure allowed for the system is 1,5 bar (equal to 15 m of the water
column). Higher pressures can cause deformation and breakage of the boiler body.