Vacuuming And Charging - Daikin FTXK09P Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SPECIAL PRECAUTIONS WHEN DEALING WITH R410A UNIT
R410A is a new HFC refrigerant which does not damage
the ozone layer. The working pressure of this new refriger-
ant is 1.6 times higher than conventional refrigerant (R22),
thus proper installation/servicing is essential.
• Never use refrigerant other than R410A in an air conditioner
which is designed to operate with R410A.
• POE or PVE oil is used as lubricant for R410A
compressor, which is different from the mineral oil used
for R22 compressor. During installation or servicing, extra
precaution must be taken not to expose the R410A system
too long to moist air. Residual POE or PVE oil in the
piping and components can absorb moisture from the air.
• To prevent mischarging, the diameter of the service port on
the fl are valve is different from that of R22.
Vacuuming is necessary to eliminate all moisture and air from the system.
Vacuuming The Piping And The Indoor Unit
Except for the outdoor unit which is pre-charged with refri-
gerant, the indoor unit and the refrigerant connection pipes
must be air-purged because the air containing moisture that
remains in the refrigerant cycle may cause malfunction of
the compressor.
• Remove the caps from the valve and the service port.
• Connect the center of the charging gauge to the vacuum
pump.
• Connect the charging gauge to the service port of the
3-way valve.
• Start the vacuum pump. Evacuate for approximately 30
minutes. The evacuation time varies with different vacuum
pump capacity. Confi rm that the charging gauge needle
has moved towards -14.7psi (-760mmHg).
Caution
• If the gauge needle does not move to -14.7psi (-760mmHg),
be sure to check for leakage at fl are type connection of
the indoor and outdoor unit and repair the leak before
proceeding to the next step.
• Close the valve of the changing gauge and stop the vacuum
pump.
• On the outdoor unit, open the suction valve (3 way) and
liquid valve (2 way) (in anti-clockwise direction) with
5/32" (4mm) key for hexagon sacked screw.
Charge Operation
This operation must be done by using a gas cylinder and a
precise weighing machine. The additional charge is topped-
up into the outdoor unit using the suction valve via the
service port.
• Remove the service port cap.
• Connect the low pressure side of the charging gauge to the
suction service port center of the cylinder tank and close
the high pressure side of the gauge. Purge the air from the
service hose.
• Start the air conditioner unit.
• Open the gas cylinder and low pressure charging valve.
• When the required refrigerant quantity is pumped into the
unit, close the low pressure side and the gas cylinder valve.
• Disconnect the service hose from service port. Put back
the service port cap.
• Use tools and materials exclusively for refrigerant R410A.
Tools exclusively for R410A are manifold valve, charging
hose, pressure gauge, gas leak detector, fl are tools, torque
wrench, vacuum pump and refrigerant cylinder.
• As an R410A air conditioner incurs higher pressure
than R22 units, it is essential to choose the copper pipes
correctly.
• If the refrigerant gas leakage occurs during installation/
servicing, be sure to ventilate fully. If the refrigerant gas
comes into contact with fi re, a poisonous gas may occur.
• When installing or removing an air conditioner, do not
allow air or moisture to remain in the refrigerant cycle.

VACUUMING AND CHARGING

1-17
Refrigerant Piping
Allen key
Flare nut
Service Port
Outdoor Unit 3 Ways Valve
HIGH PRESSURE GAUGE
LOW PRESSURE GAUGE
-14.7psi (-760mmHg)
GAUGE MANIFOLD
HANDLE HI (ALWAYS CLOSED)
HANDLE LO
CHARGE HOSE
CHARGE HOSE
LIQUID VALVE
GAS VALVE
(3-WAY)
HIGH PRESSURE GAUGE
LOW PRESSURE GAUGE
-14.7psi (-760mmHg)
GAUGE MANIFOLD
HANDLE LO
HANDLE HI (ALWAYS CLOSED)
CHARGE HOSE
CHARGE HOSE
LIQUID VALVE
GAS VALVE
(3-WAY)
VACUUM PUMP
ADAPTER FOR
COUNTER FLOW
PREVENTION
CHECK VALVE
CONFIGURATION OF AIR
PURGE BY CHARGING
CHECK VALVE
CONFIGURATION OF AIR
PURGE BY CHARGING

Publicité

Table des Matières
loading

Table des Matières