6. Packaging / 7. Starting, operation
6. Packaging
Has everything been supplied?
EN
Check the scope of supply:
Completely assembled transducer
■
Inspect the transducer for possible damage during transportation. Should there be any
■
obvious damage, inform the transport company and WIKA without delay.
The UHP transducers are purified, evacuated and double-packed in clean rooms in a
■
protective atmosphere (clean room class 5 according to ISO 14644). Special plastic
protective caps are used to protect the high-quality threaded connections (fittings).
The gauges should remain in this special packaging until installation in order to prevent
damage and contamination. Therefore remove the ESD (Electro-Static-Discharge)
protective foil only at the place of installation.
Keep the packaging, as it offers optimal protection during transportation (e.g. changing
■
installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
■
damaged.
Remove this protection cap only just before installing the transducer.
■
Mount the protection cap when removing and transporting the instrument.
■
Unpack the transducer
1. Remove the transducer from the box.
2. Remove the outer protective bag and discard.
3. Carry the transducer (sealed in the inner bag), into the clean area.
7. Starting, operation
Required tools: wrench (flats 19 and 16), screw driver (0.040" to 0.060" / 1 to 1.5 mm) and
a pair of scissors, allen key for WU-26
8
WIKA operating instructions, model WU-2x