6 MAINTENANCE
6.1 Introduction
Operations on the internal parts of the stove must be carried out by qualified personnel. Contact the nearest
authorised service centre.
Make sure the stove is unplugged and cold before carrying out any work on it.
6.2 Removing the cladding
6.3 Stove internal parts
55
Key:
1 - Top cover
2 - Bottom front panel
3 - Rear panel
4 – Lateral cover
5 – Right/Left side panel
6 – Bottom cover
7 - Pellet hopper door
Key:
1 - Combustion chamber
2 - PENELOPE right-left supports
3 - Cast iron exchanger
4 - Vermiculite side walls
5 - Vermiculite upper baffle
6 - Vermiculite rear wall
PENELOPE HR