Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EBZ7500/RH

6. Set up

F1
F2
F2.5
F3
F4 [EBZ7500RH]
F5 [EBZ7500RH]
US-8
■ BLOWER
1. Connect the blower and pipe with flexible hose. Clamp
both ends of the flexible hose securely with the
hardware supplied with the unit. (F1)
2. Set up the grip (6) [EBZ7500] or the throttle lever (7)
[EBZ7500RH] to the pipe (2) and tighten it by bundled
two screws. (F1)
3. When connecting the pipe (2) with flexible hose, set
"UP" mark on the pipe facing upward. (F1)
4. Align the protrusion and the groove provided on the
tube ends and twist the tube until connection is locked
up. (F2)
5. Apply grease to the pipes if necessary.
(1) Flexible hose (2) Pipe
(3) Clamp (4) Pipe, straight
(5) Pipe, end (6) Grip assy [EBZ7500]
(7) Throttle lever [EBZ7500RH] (8) Screws
NOTE
A light lubricant may be used to ease assembly of
flexible pipe to blower elbow.
■ GRIP
• The position of the Grip can be adjustable back and
forth by loosening "knob bolts" on Grip by hand. (F2.5)
(1) Knob bolt
NOTE
"Pipe, end" can be connected with "Pipe, straight" in two
opposing directions, (a & b) as described in (F3).
a: Operator can feel "Light-weight body" than usual
due to the air stream.
b: Operator can feel "Higher performance" due to the
air stream.
■ THROTTLE LEVER [EBZ7500RH]
• The position of the throttle lever can be adjustable
back and forth by loosening "knob bolts" on Grip by
hand. (F4)
(1) Throttle Lever
(2) Pipe
(3) Knob bolt
■ THROTTLE CABLE [EBZ7500RH]
• Use the clamp to fasten the colgate tube containing the
throttle cable and the power cable to the hose. (F5)
(1) Clamp
(2) Cable
(3) Flexible hose

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ebz7500rh

Table des Matières