REMOVING THE STEEL QUIK-LOK
•
Remove external retaining ring (38) and pull front cam (48) off.
•
Pull lock pin (55) out and remove remainder of parts and discard.
REASSEMBLY OF THE STEEL QUIK-LOK
•
Coat new lock pin with powdered graphite.
•
Hold tool in a vertical position.
•
Place spring cover onto spindle.
•
Slide torsion spring (40) onto spindle with spring leg on hole side of spindle.
•
Slide sleeve (64) onto spindle aligning hole on sleeve with hole in spindle.
•
Slide rear cam over sleeve until it bottoms on sleeve shoulder, ensure spring leg
inserts into groove of cam.
•
Rotate rear cam in the direction of the arrows located on spring cover until there is
clearance for lock pin (55) to be inserted into sleeve/spindle holes. Insert lock pin.
•
Align front cam (48) inner ribs with rear cam outer slots and slide front cam onto sleeve
until it bottoms. Retaining ring groove should be completely visible.
•
Attach retaining ring (38) by separating coils, inserting end of ring into groove. Wind remainder of ring into groove. Ensure ring is seated in groove.
•
Blade clamp should rotate freely. During normal usage, debris may not allow blade clamp to rotate freely. The use of spray lubricant can
help free blade clamp. In extreme conditions, follow these instructions to remove, clean and reassemble blade clamp.
®
BLADE CLAMP -
VERSION 1
®
BLADE CLAMP
Spindle (39)
Spring Cover (3)
Torsion Spring (40)
Leg
Lock Pin (55)
Hole/Groove
Sleeve (64)
Rear Cam (7)
Front Cam (48)
Retaining
Ring (38)