UK
VERMICULITE FIRE BRICK INSTALLATION SEQUENCE – WESTFIRE UNIQ21
Installation procedure:
Right inner top baffle brick 2 – positioned
on secondary air pipe & side supports.
1 –
Left Inner Top Baffle Brick
2 –
Right Inner Top Baffle Brick
3 –
Rear Brick
4 –
Left Base Brick
5 –
Right Base Brick
6 –
Left Angled Side Brick
7 –
Right Angled Side Brick
8 –
Left Side Brick
9 –
Right Side Brick
10 – Top Baffle Brick
Left inner top baffle bricks 1 positioned on
secondary air pipe & side supports.
Right inner top baffle brick 2 – positioned
on secondary air pipe & side supports.
Top baffle bricks 2 & 3 fitted.
Rear brick 3 – line up tertiary air holes.
Front face of brick has smaller surface area.
Left & right base bricks 4 & 5 fitted – with
metal base brick tensioner positioned
at side.
WESTFIRE · WF21
1.
2.
10.
3.
6.
7.
8.
4.
5.
16
9.
Left and right angled side bricks 6 &
7 fitted.
Left and right angled side bricks 6 &
7 fitted.
Left and right side bricks 8 & 9 fitted.
Left and right side bricks 8 & 9 fitted.
Top baffle brick 10 (smallest straight edge
resting on top edge of rear brick) fitted
and supported with two side pins.