Lenze 8200 motec E82MV551_4B Instructions De Montage page 98

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
Mechanical installation
Motor mounting
Preparation
0
1a
1a
8200mot007
Preliminary work on the motor: remove terminal box seal 0 and motor terminal board and, if required,
extend motor cable.
Mount the carrier housing to the motor:
l
The fastening used must ensure a permanent mechanical connection, e.g. by the use of serrated lock
washers 1 (DIN 6798).
If a clearance 3 is required: use (2a), (3), and 35 mm screw (DIN 7985) (without 3: only 20 mm screw
l
(DIN 7985))
Perfect sealing is required to ensure IP65 enclosure.
98
3.4 Nm
30 lb-in
68-73mm
Fig. 4−4
1 × M20 (E82MV152/
E82MV222)
2 × M25
4
× M16
l
2
1
1a
2a
3
2a
5a
3
EDK82MV222 DE/EN/FR 11.0

Publicité

Table des Matières
loading

Table des Matières