Télécharger Imprimer la page

EdilKamin INPELLET 49 Installation, Usage Et Maintenance page 28

Masquer les pouces Voir aussi pour INPELLET 49:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
PELLET LOADER INSTALLATION
Note:
The loading inlet can be installed on the front, on the right
side or on the left side of the mantel.
Shortening the pellet loading tube (supplied with a length
of 8 cm), depending on the position of the hearth, is man
datory so that it stays taut, in order to facilitate the pellets
dropping into the hopper.
Before fully closing the mantel, carry out pellet loading
test to make sure they drop correctly.
Correctly insulating the loading tube is mandatory as it
must not come into contact with the smoke channel.
st phase
INSTALLING THE LOADING INLET
( g. 1 and )
Only mount the front or side wall of the mantel, onto which
the loading inlet will be attached;
complete the mantel only after verifying the correct opera
tion of the entire loading system.
a e a 18.
18. cm hole.
Secure the loading inlet to the mantel using the self-tapping
screws supplied, using the holes on the mantel frame; reinforce
the plasterboard, attaching metal pro les on the rear (A g. ).
2nd phase
INSTALLING THE LOADING TUBE ( g. and )
Secure the e ible tube to the outlet on the loading inlet using
the clamps supplied ( g. )
ut the tube to size and t the end of the tube on the centring
brac et (E g. to the side and g. on pg.
using the clamps provided.
3rd phase
COMPLETING THE MANTEL
Before fully closing the mantel, carry out pellet loading test
to ensure the pellets are dropped correctly and there are no
obstacles to proper loading.
INSTALLATION
ITH DOOR
g. 1
LO DIN
INLET
LO DIN
T BE
) and fasten it
g.
g.
- 28
-
A
A
ET L REIN-
FOR E ENTS
E

Publicité

loading

Ce manuel est également adapté pour:

2300l6003