Télécharger Imprimer la page

Bradley S19-2000 Série Instructions Pour L'installation Et L'entretien page 5

Robinet thermostatique mélangeur efx 8 avec cabinet facultatif
Masquer les pouces Voir aussi pour S19-2000 Série:

Publicité

Les langues disponibles

Les langues disponibles

Installation and Maintenance Instructions
Installation Instructions: Valve with Optional Surface-Mounted Cabinet
Note: Flush the supply lines before beginning installation.
1. Measure and mark the cabinet mounting hole locations at the dimensions shown in Figure 4. Install six
1/4" wall anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into place with six 1/4" wall fasteners (supplied by
installer).
3. Insert the valve into the bracket in the cabinet (right side of the valve goes in first). Install the valve,
elbows and stops onto the inlet and outlet piping.
4. Continue with the valve installation procedure found on page 3.
FRONT VIEW
5-1/2"
(140)
11-1/4"
(286)
Door
3"
(76)
Figure 4
Bradley Corporation • 215-1291 Rev. L; EN 07-903A
Bradley EFX 8 Thermostatic Mixing Valve with Optional Cabinet
9-3/4"
(248)
Door
5"
(127)
11"
(279)
Box
BOTTOM VIEW
11"
(270)
Model S19-2000 Series
SIDE VIEW
1/2" NPT Outlet
6-1/2"
1/2" NPT Inlets
(165)
MOUNTING HOLE LOCATIONS
5/16" (8) Ø
(6) Holes
8-1/2"
(216)
3-1/4"
(83)
2"
(51)
2"
(51)
5/14/08
2"
(51)
2-1/2"
(64)
12-1/2"
(318)
2-1/4"
(57)
3/4"
(19)
5-1/2"
(140)
7"
(178)
5

Publicité

loading

Ce manuel est également adapté pour:

S19-2000efx sérieS86-066