Installation; Assembly - SCHOLTES HP 96 IX Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18

Installation

Assembly

GB
Before proceeding with the assembly operations,
remove the grease filters so that the hood is easier to
handle (for the instructions see the paragraph
"Cleaning the grease filters" in the chapter on
"Maintenance").
Fixing to the wall
1) Draw a line on the wall along the vertical axis of the
hob. Mark the 2 holes (A) to be made in the wall
respecting the measurements indicated in the figure
below.
2) Drill the holes (8 mm ø) and fit the 2 screw anchors
(provided).
3) Fix the metal bracket (B) to the wall with 2 screws
using the 2 holes drilled. Use the 2 triangles cut into
the bracket to position it exactly along the vertical
axis of the hood.
4) Then hook the hood onto the metal bracket.Adjust
the horizontal position by moving the hood to the
right or left as required to align it with the wall
units.
10
5) Once adjusted, finally fix the hood with a further
4 screws (D): Mark the 4 holes to be drilled on the
wall, unhook the hood and drill the holes marked (8
mm diameter); then use the screw anchors and
the screws provided for final fixing.
6) Mount the plate of the electrical system (Q) fixing
it with 2 screws.
7) For the hoods in ducting version, install the flange
(R) in the device air outlet and press slightly.
8) For the hoods in filtering version, fit the reducer
(E).
Securing the decorative flue
1) Assemble the support bracket of the decorative flue
and adjust the width with the 2 screws (F).
Then, using the screw anchors and the screws (G),
secure it to the ceiling in such a way that it is in line
with the hood.
2) For the filtering version, the air vent grilles (H) must
be positioned at the top. For the ducting version,
turn the upper flue upside down so that the air vent
grilles are at the bottom.

Publicité

Table des Matières
loading

Table des Matières