Test Run; Packing List - Vortice VORT SUPER DRY Notice D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ENGLISH
(Fig.27)
Attach the front panel
• Insert the 3 front panel chuckholes into the unit.
• Replace the 2 screws that were removed.
• Attach the drain tank.
• Make sure the air filter is all the way in

Test run

1
Check the voltage of power supply
2
Turn the ground-fault circuit breaker on
3
Turn the power switch on
4
Dry hands
5
Check the unit
* Do not turn the unit power switch on with your hands inside
* If the self-check indicator in the display lights or is flashing, turn off the power switch off, and turn the power back on-
when all the indicators go off (after 40 seconds).

Packing list

Unit:
Mounting plate:
5mm Expansion pipe
5x30 Self-tapping screw
User manual (include packing list and warranty card
Method of use figure
Key
Step
27
27
Check
Please use the rated voltage?
Does the power indicator light up?
Is the air blowing?
Is the unit installed firmly? Any
vibration or strange noise?
1
1
6
6
1
1
1
Result
27

Publicité

Table des Matières
loading

Table des Matières