WELDING
Welding preparation
• Check :
– Laying out of material
– Mains supply
– Cable to mains
Operating conditions
• Attach guide bar (14) or guide handle (15).
• Move the hot air blower (3) out and lift up until it locks.
• Connect the tool to the mains.
• Adjust welding parameters, see page 21.
20
Width of overlap 80 mm to 125 mm
Geomembrane liners must be clean between
the overlap as well as above and below
at least 5 kW (generator)
supplied with an RCCB
a minimum cable cross section in
accordance with the table
230 V~
to 50 m
to 100 m
120 V~
to 50 m
to 100 m
2
2 x1,5 mm
/ 2 x14 AWG
2
2x2,5 mm
/ 2 x12 AWG
2
2x1,5 mm
/ 2 x14 AWG
2
2x2,5 mm
/ 2 x12 AWG