Final Assembly
20. Control the vertical line of the whole stair and, if necessary, correct it by moving the support N16 (fig. 1).
21. Disassemble the first tread (L40) and drill the floor with a D. 14 mm (
holes on the support N16 (fig. 1).
22. Insert the parts F20 and tighten completely (fig. 1).
23. Reassemble the first tread (L40) and fix on the floor, in relation to the first baluster (C12), the part F01,
by drilling with a D. 8 mm (
24. Insert the baluster (C12) and tighten the part B02 (fig. 1).
5/16
"
) tip. Use the parts C58, B12, B83 and B02 (fig. 1).
35/64
7 - kr
"
) tip in relation to the present