M
ASSEMBLY ONTO THE BOILER
EM 3 -E
EM 6 - E
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4. Insert the burner
in the flange so that the draught tube penetrates into the combustion chamber by the length
suggested by the boiler manufacturer. Tighten nut 1 to lock the burner in position.
EM 9 -E
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possible
insulating cord 5. Insert the burner in the flange so that the draught tube penetrates into the
combustion chamber by the length suggested by the boiler manufacturer. Tighten screw 1 to
UK
lock the burner in position.
35