Initial commissioning
Making add-on unit ready for operation
Prerequisite
Function checks with the control panel and with the
remote control have been completed successfully.
1
Remove the spray shield.
2
Clean the add-on unit.
22
Hand add-on unit over to the customer
1
2
3
2
1
4
Explain the main functions of the toilet to
the customer.
Refer to the operating instructions for
detailed information.
Hand over end-user documentation to the
customer.
Fill in the warranty card together with the
customer (end-user documentation),
attach the serial number sticker and send it
to Geberit.
Attach a second serial number sticker, for
example to the last page of the operating
instructions, so it is available for later use.