Electrical Installation; Schematic Diagram Of Installation; Schematic Overview - Tylo VISTA 2900 3015 Guide D'installation/Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
24
Electrical connection may only be carried out by a qualified electrician in accordance with
applicable laws and regulations.
The steam generator power supply line comes directly from the electrical distribution board. This line should be equipped with a multi-
pole main switch to allow the steam generator to be temporarily switched off during servicing. A residual current device of max. 30mA
must be fitted (see fig. 6). The circuit breaker may be switched off no sooner than 90 minutes after completed use of the
steamroom.
The fixed installation must include a switch-off function in accordance with valid regulations.
Note: The Elite control panel and the temperature sensor are factory-connected to the relay board. The box containing the relay
board must not be opened during installation. Only open the box to perform troubleshooting. See fig. 5 for connections, as well as the
Modular contactor description section (Fig. 10, table 1).

Schematic diagram of installation

Control Panel
1
2
6
Steam private
On
Off
1
Factory settings
Dipswitch
Fig. 5 Schematic diagram of installation, Stella steam generator

Schematic overview

1A - Terminal Main voltage in
1B - Terminal Interior lighting
1C - Terminal Aux
1E - Terminal for interior lighting
2 - Flex tube for Vista ceiling, can be clamped to side profile

Electrical installation

Temp Sensor
3
4
5
7
8
9
CTS
2
3
4
5
6
1E
1B
1A
1C
2

Publicité

Table des Matières
loading

Table des Matières