Technical Specifications; Pipework Installation; Water Connection - Tylo VISTA 2900 3015 Guide D'installation/Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57

Technical specifications

The steam generator is equipped with:
Aluminium water reservoir
Water reservoir volume. 2 litres
Acid-proof stainless steel tubular elements
Automatic emptying 60 minutes after the steam bath
has been switched off
Automatic flushing after emptying
2-division output
Electronic water level regulation
Electronic level protection
Acid-proof stainless steel electrodes
Continuous steam production
Always use the correct power output, regardless of the water
quality and level
Built-in temperature cut-out
Built-in dirt filter
Automation for remote control
Rinse-proof design
IP class X5
Error code clearing
Automatic emptying during operation, adjustable
Built-in Wi-Fi module 2412-2462 MHz, <20dBm. The product
must be installed and used so as to maintain a minimum
distance of 20 cm from the user.

Pipework installation

To be done by an authorised plumber.

Water connection

Preparatory pipe installation. Always use approved connections
and hoses for fixed installation. Install Stella in Wet ZONE 1
Connect the incoming water using the hoses supplied (1300 mm
long, 1/2")
IMPORTANT!
Before the incoming water supply is
connected to the steam generator, the piping system must be
flushed through. Flushing prevents metal particles and other
impurities entering the steam generator system from the piping.
IMPORTANT!
The incoming water pressure must be
between 1 and 5 bar (min 100kPa and max 500kPa).
It is an advantage to install a shut-off valve in the water supply
line to facilitate repairs/servicing.
3.
cc 90 mm
2.
3.
cc 90 mm
Fig. 4 Connection terminals
1. Hot / Cold water with shut-off option 1/2"
2. Area for electrical wiring
3. Suspension holes
120 mm
1.
795 mm
23

Publicité

Table des Matières
loading

Table des Matières