Avoid any tributary connection from the main circuit. If absolutely necessary then as short as
possible. Observe DIN 1988 / 1717. Additional heating cable is recommended if installed in
not frost-protected areas or in draughty locations.

Start of operation:

1. Main
switch in "0 = OFF" position, pos. (4)
2.
Fill water circuit with water
3.
Bleed water circuit, pump and heating unit, over pos. (2), pos.(5) and pos.(12)
Check that by-pass line is closed and that water circuit runs through the
heating unit!
4. R
emaining air bubbles will automatically escape through pos. (7)
5.
ECU switch to "1 = ON" position
6. C
irculation pump is switched on. Heating element is ready to work.
Repeat point 3!
7. Adjust the necessary temperature of the forward flow on the heating element pos. (8)
Control lamp at the heating element only illuminates if the heating element is on.
Delivery scope, ex works
( 1) Cast iron case, completely enamelled
( 2) Circulation pump 230 V
( 3) Non-return valve for water connection
( 4) Main switch ON / OFF
( 5) Ventilation screw
( 6) Pressure relief valve 6 bar
( 7) Automatic vent valve
( 8) Heating Element 1½", 230 V or 400 V,
3000 W with thermostat and STB
(15) Non-return flap
Installation
7
12
11
11
25 cm
8
2
9
11
tempered
11
room
13
! Attention: when bleeding the hot water can escape!
13
13
10
19
15
17
Not included in the scope of delivery
( 9) Drain cock
(10) Residual-Current Device 230 V or 400 V, 0,03 A
(11) Lock valve
(12) Shut-off valve for manual ventilation
(13) Insulation material, min. thickness 30 mm
(14) Bite protection
(16) SUEVIA Drinking Bowls
(17) Flow control Mod. 309
(18) Filter
(19) Heating cable
(20) Alarm System for water circuits (Ref. 101.0308)
13
13
14
14
16
13
Installation scheme
20
°C
20
30
10
40
0
50
13
14
16
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

300

Table des Matières