1.
Safety instructions
a
For skilled electricians and trained
personnel in accordance with national
legislation, including the relevant stand
ards and, where applicable, in acc. with
IEC/EN 6007917 on electrical apparatus
for explosive atmospheres.
-
The battery must not be operated in zone
0 or zone 20 hazardous areas!
-
The light fitting must not be use while
excessive deposit of dust
(accd. IEC/EN 60079-31) exist.
-
The technical data indicated on the light
fitting is to be observed!
-
Changes or modifications to the battery
are not permitted!
-
The battery is only to be used as intended
and in undamaged and correct working
order!
-
Only genuine Cooper Crouse-Hinds (CCH)/
CEAG parts are to be used!
-
Repairs that affect the protection against
explosion, may only be performed by
CCH/CEAG or a qualified electrician (see
relevant national regulations)!
Observe the national health and safety
regulations for prevention of accidents
that are marked with a (
operating instructions!
6
2.
Conformity with standards
This device is suitable for use in zone 1, 2,21
and 22 hazardous areas according to
IEC/EN 60079-10-1 and IEC/EN 60079-10-2.
References to standards and directives in these
operating instructions always relate to the latest
version. Other additions (e.g. details relating to
the year) shall be observed.
3.
Technical data
EC type examination certificate:
eBK 02 NIB/eBS 09 NIB/
eBB 20 NIB:
battery set NIB 2710-3 BVS 09 ATEX E042 U
Categorisation in accordance with
2014/34/EU
EN 60079-0
IEC 60079-0
Categorisation in accordance with
2014/34/EU
Insulation class
to IEC/EN 60598:
Battery block:
Standard
) in these
Display of the charge
state:
Service indicator:
Rated capacity:
Charging time:
LED indication:
Duration of
emergency lighting:
Battery set dimensions: see fig. 1
Degree of protection
EN/IEC 60529:
Operation temperature
Type NIB 2710-3
Storage temperature
in original packing:
less then 1 month:
Weight:
Cable glands certified 1 x M20 x 1.5,
2014/34/EU
accd.
or
Note: New batteries will reach their total useful
1)
capacity only after 3 charging/discharging cycles.
For further technical data, see the operating
instructions
eLLK 92 NIB; eLLS 08 NIB (300 8000 1455)
and eLLB 20 .. NIB (300 8000 2018).
BVS 09 ATEX E044 X
IECEx BVS 10.0003X
IECEx BVS 14.0085U
Gas:
II 2 G
Ex d e mb ib IIC T4 Gb
Ex d e mb ib IIC T4 Gb
Dust:
II 2 D
Ex tb IIIC T80°C Db IP66
I
NIB 2710-3 5 x NiCd
BVS ATEX E 103 U
D II 2 G Ex e IIC Gb
IECEx BVS 11.0073 U
Ex e IIC Gb
5 green LEDs
1 red LED
7 Ah
1)
approx. 14 h (>90%)
LED indication Recharging
(green)
time
approx. (h)
5 LEDs
4 LEDs
3 LEDs
2 LEDs
1 LED
0 LED
Can be set to either 1.5 h
or 3 hours
IP 66 (in conjunction with
the light fitting)
-25 °C up to +55 °C
+ 5 °C up to +35 °C
-40 °C up to +65 °C
approx. 1.8 kg
1 x blanking plug M25
connector system
GHG 57. (eXLink)
4.
Function
Display
The battery NIB 2710-3 fitted to the front of the
emergency light fitting is fitted with a microcom-
puter for charging and monitoring and with a
display composed of 6 light emitting diodes (fig.
1). The five green LED's indicate the battery's
charge state and available capacity. The red LED
signals possible failures (fig. 2 and 3).
Automatic function test
Function test (FT)
A function test (FT) is performed automatically.
During this process the emergency luminaire is
switched to battery supply for approx. 5 min. and
tested.
Partial operating time test (TBT)
Every 3 months a partial operating time test is
performed. If no emergency lighting operation >
30 min. has occurred during the last 3 months.
During this test emergency lighting operation is
performed for approx. 35 min.
Charging
The microcomputer controlled charging system
measures the charging and discharging current
and transmits it to a capacity meter. Five green
light emitting diodes indicate in 20%-steps the
actual charge state of the battery, see fig. 2.
Overcharging is prevented by means of this
charging control dependent on the capacity. Only
the energy drawn is recharged. The so-called
memory effect is thus also prevented.
At temperatures below -5°C and above +30°C the
battery will not be fully charged for electrochemi-
cal reasons.
During the charging process the leading flashing
LED indicates the amount of capacity charged so
far. The LED's for the capacity already charged
indicate continuously (fig. 3). The charging
process is complete when all five green LED's are
illuminated and none is flashing.
0
The LED display takes into account the decline
4.5
in the capacity of the battery: i.e., if the indica-
7.0
tion does not go beyond the 3rd green LED even
9.5
after an extended charging period, the available
12.0
capacity is between 40 and 60%.
16.0
This indication is updated again on each emer-
gency lighting operation until the battery is shut
down by the deep discharge protection for the
battery.
The reduction in the battery capacity due to self-
discharge in normal operation is automatically
recharged controlled by the microprocessor .
Emergency lighting operation
The duration of emergency lighting can be set to
either 1.5 or 3 hours, see eLLK 92 / eLLS 08 NIB
operating instructions (300 8000 1455).
Emergency lighting operation is automatically
initiated by the FT+TBT, by mains failure, or
manually by shutting down the mains supply.
During this process the emergency luminaire
marked in red is switched to battery operation.