Connection diagram for
Fig. 4
battery unit
Warning! In case of exchange:
connection scheme:
- ensure that no explosive
atmosphere is present
- fasten wires into bushings
on top, before dismounting
battery pack!
Fig. 5 Transport of battery unit
CEAG
GHG 750 1001 R0002
Text 1
Text 1
www.CEAG.de
Attention!
Do not exchange
single batterie!
Transporting in
Attention!
original packing only!
Mounting and transporting
Mounting and transporting
Mounting and transporting
in specified position only!
in specified position only!
in specified position only!
Fig. 6 Installation/dismantling
of battery unit
Transport holder for
connection leads
4 x M6 fixing screws with
spring washers
7.2
Maintenance of connection box
Check all seals to ensure that they are
effective and not damaged. Replace older or
damaged seals by new ones. Check
connection terminals and cable entries to
ensure that they fit securely.
Clean to remove any damp/condensation
+UB
battery
1
and dirt.
-UB1
+UB2
battery 2
battery 2
7.3
Maintenance of battery
-UB
Clean the battery enclosure with a
a
dampened cloth – only use water without
bridge
additives.
7.3.1
The following shall be measured
and recorded every 6 months:
- Difference in charge voltage of both
batteries:
- Switch off mains voltage supply.
- Carry out a 5-minute function test.
upside
-
Before opening the enclosure,
ensure that no potentially explosive
atmosphere is present.
bottom
- Measure the charge voltages of both
side
batteries at the terminal strip.
Battery 1: Terminals +UB and UBT
Battery 2: Terminals –UB and UBT
If the difference in voltage between the two
voltages measured is more than 1.2 V, the
complete battery unit shall be replaced
(see Section 8.1).
- Surface temperature of the batteries:
In both cases measure the surface
temperature on the top at the centre of the
battery.
If the difference in temperature between the
two surface temperatures measured is
more than 5 K, the complete battery unit
shall be replaced.
The following shall be measured and
recorded on an annual basis:
- Insulation resistance (1 MOhm) in acc. with
DIN EN 60079-7 5.7.1.3.6
7.3.3. Visual inspection
- Battery contacts
- Battery mountings
- Ventilation
If, in the course of servicing, it is ascertained,
that repairs are necessary, section 8 of these
operating instructions shall be observed.
8
Repair / Overhaul/
Only original Cooper Crouse-Hinds / CEAG
parts shall be used for carrying out repairs
that concern the explosion protection.
Repairs that affect the explosion
protection may only be carried out by
Cooper Crouse-Hinds / CEAG or by a
qualified electrician in compliance with
the respective national regulations.
Before opening the enclosure ensure that
no potentially explosive atmosphere is
present.
Prior to opening the enclosure, it is
necessary to ensure that the voltage
supply has been isolated or to take
suitable protective measures.
Switch the „ON/OFF" switch (light switch)
for the connected emergency lighting
luminaire to the „OFF" position.
In the event of damage to the flameproof
encapsulation, replacement of these
components is mandatory. In case of
doubt, the respective apparatus shall be
sent to Cooper Crouse-Hinds / CEAG for
repair.
8.1. Replacing battery unit
Observe the information on the
adhesive labels on the battery unit (see
also Figs. 4 and 5).
Replace complete battery unit only.
Never replace, swap or transport/dispatch
individual batteries.
Before opening the enclosure, isolate the
mains voltage and switch the „ON/OFF"
switch (light switch) for the connected
emergency lighting luminaire to the
„OFF" position.
Warning – short circuit: voltage at the
connection leads of the battery
To prepare the built-in charging electronics
for the changeover to the battery unit, pull out
the "Plug-in jumper" from terminal-rail X1
between
UBT / +UB2 / -UB1
Disconnection of battery unit:
- First disconnect the connection lead at the
terminal block X1, terminal UB1.
- Plug the connection lead into the transport
holder provided (Fig. 6).
- Disconnect the remaining three connection
leads of the battery unit as described and
plug them into the transport holder.
- Undo and remove the screws of the battery
unit.
- Remove battery unit with mounting plate.
- Observe information on transporting
batteries in Chapter 9.1.
- Mounting in reverse order.
- Plug in "Plug-in jumper".
- Put into operation in accordance with
Chapter 6.5,.
Modifications or constructional changes
to apparatus are not permitted.
Cooper Crouse-Hinds GmbH
11
11
11
11
11