D Now let down the weighbridge carefully such that there is just no load on
the load cells and that they can be aligned perpendicularly. At the same
time, introduce the load cells' upper load introduction parts into the upper
load carrying element. For this purpose, you can move the lower load
introduction element with the eccentric washers loosened. We recommend
that you use an appropriate prism level to check the load cell's
perpendicular mounting position by holding it against the cylindrical housing
tube. Then let down the bridge and proceed in the same way for the other
face.
ATTENTION
Align load cells vertically!
D After finishing themounting procedure, once again check the perpendicular
mounting position for all the load cells, with the bridge swinging free and if
required, lift the bridge to correct the position. Exact mounting is an
important condition for accurate measurements and minimum corner
deviation.
D Once the final perpendicular alignment of all load cells has been
completed, turn the eccentric washers towards the load introduction part
and secure by tightening the fixing screws.
D Turn the flexible tube already mounted on the load cell down over the
compression pad and directly fix it on the compression pad using the tube
clip.
ATTENTION
There is no warranty in case of un- -lubricated compression
pads and if the flexible tube has not been mounted correctly!