Waeco AirCon ServiceCenter ASC1100G Notice D'utilisation page 95

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 179
ASC 1100G
8.8.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 96.
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key .
5. Enter the refrigerant quantity.
6. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the quan-
tity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil, a vacuum process must be performed in the same
process sequence. If no vacuum process has been selected, only
refrigerant can be selected in the filling menu.
EN
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
0
ml.
0
g.
500
Operation
95

Publicité

Table des Matières
loading

Table des Matières