Teuco S01 Manuel De L'utilisateur page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

POWERING-UP THE SYSTEM
FILLING THE TUB
S01 - S02
PRELIMINARY OPERATIONS
Position the isolating switch (fitted during installation) to "ON".
The display goes into STAND-BY mode, showing the exact time.
BATH ONLY
Fill the tub until the water level is no more than approx. 4 cm over the
jets.
Do not allow the water used for a cleansing bath to flow into the perimeter
drainage channel.
SPA FUNCTION
To use the bath as a spa tub, it is necessary to fill it (by hand or using
the automatic filling system) until the word "H 2 O" disappears from the
control panel; for this to happen, the bath needs to be filled to the top and
there must be a sufficient amount of water in the internal tank, which is
supplied by the side drainage channel.
EN
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S02

Table des Matières