Vermeiren Luna Mode D'emploi page 17

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
3.3.1 Front parts
2
3
Place the slatted frame ends into front parts' sockets (fixing screws must be loosened 
beforehand; don't tilt!).
The slatted frame headrest comes fitted with sockets for the boom as well as a power
N.B:
cable suspension.
Fasten with the securing screws by tightening them far enough to go through the
fixing holes of the front parts' sockets and thus locking it in place (tighten very 
properly!).
Protect the electric lead to the motor against damage by squashing.
3.3.2 Slatted Frame
1
Erect both slatted frames and insert them into each other flush.
Then properly retighten the fixing screws of the slatted frame connection.
Protect the electric lead to the motor against damage by squashing.
1
2
Page 15 
1 = Slatted frame ends
2 = Front parts' sockets
3 = Fixing screws
3
1 = Slatted
1
frames
2 = Fixing
screws
EN
Luna
2010-11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Luna basicLuna deluxeLuna x-lowLuna metal

Table des Matières